Construction Precautions — Concrete Stamps Mold

News 2023年3月30日 206

Construction Precautions — Concrete Stamps Mold

1. The pavement length of each circle of concrete surface should be coordinated with the construction of Ruili colored flat pavement. The construction area is controlled at 200m2/shift per day (ten hours). Otherwise, it will directly affect the construction quality.

2. The surface treatment of the concrete surface should be carried out according to the design standards and requirements, and the surface should meet the required flatness, transverse slope and width. The quality of the concrete must be consistent throughout the same project, which is very important for the consistency of the final overall effect.

3. Use professional tools to smooth the concrete surface and smooth the corners.

4. The reinforcement material may agglomerate during transportation, so the reinforcement material should be dispersed with both hands.

5. After the free water on the concrete surface dissipates, the hardened material can be spread evenly on the concrete surface.
6.Strictly follow the construction process requirements when spreading hardened materials, and do not shovel too much on the concrete surface, otherwise it will cause surface bleeding and fading.

See next update for more details.